€94.7M
Penalties paid by Enedis to residential customers for long outages, 2025 p.16
Largest segment
5200 MW
Capacity created in the Dunkerque pooling zone p.24
What changed
52 EUR million per year (+/-)
Increased financial caps of the connection incentive regulation p.22

Summary

  • RTE operates the largest network in Europe, with more than 100,000 km of lines from 63,000 to 400,000 volts.p.10
  • For TURPE 7 HTB, targets are 2.9 min/year of equivalent outage time and 0.38 outages/year, with a global incentive cap of +/- 50 M EUR.p.16
  • In 2025, penalties paid by Enedis to residential customers for long outages totalled 94.7 M EUR.p.16
  • Financial caps of the connection incentive regulation were increased to +/-52 M EUR per year.p.22
  • Five pooling zones were validated, including Dunkerque with 5200 MW of created capacity and Le Havre Port-Jerome with 1500 MW.p.24
  • RTE was asked to pre-reserve capacity at 5 suitable sites, with 700 MW at four of them and 1 GW at Le Bosquel; four winners were selected in June 2026.p.25
  • At 31 December 2025 the CRE had 159 staff, of which 67 women and 92 men, compared with 155 staff a year earlier.p.9

Key insights

  1. The CRE considers that RTE's independence from its shareholders stayed at a very good level between 2023 and 2025.p.12
  2. For TURPE 6 HTB, the target levels were set at 2.8 min for equivalent outage time and 0.46 for outage frequency.p.15
  3. Over the TURPE 7 period, the global incentive cap is set at +/- 50 M EUR with a symmetric incentive.p.16
  4. The global cap on Enedis financial incentives was set at +/- 83 M EUR in TURPE 6 and raised by 10% in TURPE 7.p.17
  5. Enedis connection indicators deteriorated between 2025 and 2026, except for individual low-voltage connections without network extension.p.22
  6. Loire Estuaire pooling zone creates 1150 MW of capacity with a share of 127.77 k EUR/MW after the reduction.p.24
  7. Dunkerque pooling zone creates 5200 MW of capacity with a share of 42 k EUR/MW after the reduction.p.24
  8. RTE has implemented optimised connection offers for storage installations since 2024.p.26

Topics and entities