Annual Report to the European Commission: Main Developments in the French Electricity and Natural Gas Markets in 2024 and the First Half of 2025 (CRE)
SaveSummary
- In 2024 the CRE reviewed more than 3.67 GW of wind and 3.77 GWc of photovoltaic capacity, covering 794 files.p.7
- France exported nearly 90 TWh of electricity as production rose sharply.p.7
- The Linky smart meter rollout installed 34.3 million meters by end-2021, at a final cost of 4 billion euros.p.19
- Enedis paid 87 million euros in penalties to residential customers for long outages in 2024.p.16
- Enedis's 2024 service-quality incentives produced an overall malus of 19.8 million euros.p.17
- For TURPE 7 the CRE set RTE's outage targets at 2.9 minutes per year and 0.38 outages per year, with an incentive cap of 50 million euros.p.15
Key insights
- The CRE's 2024 tender work covered 3.67 GW of wind and 3.77 GWc of solar, across 794 files.p.7
- RTE operates a network of more than 100,000 km of lines, the largest in Europe.p.10
- Enedis manages 95% of the distribution network in mainland France, while 114 local distribution companies operate the rest.p.12
- The Linky project cost 4 billion euros, nearly 700 million euros below the initial budget.p.19
- Penalties paid by Enedis to residential customers totalled 87 million euros in 2024.p.16
- Enedis's 2024 performance on connection times for high-voltage (HTA) consumers improved, reaching 232 days on average, a 6% reduction.p.22
- Enedis's average connection time for low-voltage consumers above 36 kVA reached 154 days in 2024.p.22
- Under TURPE 7, the global cap on Enedis's continuity-of-supply incentive is set at +/- 91 million euros.p.14