Financing Battery Energy Storage Systems in Indonesia (IEA)
SaveSummary
- In the STEPS, Indonesia's electricity demand rises from nearly 500 TWh in 2025 to nearly 800 TWh by 2035.p.7
- The RUPTL 2025-2034 aims to install 69 GW of power capacity, including 6 GW of standalone storage and 3.6 GW of hybrid (solar PV-plus-BESS) capacity.p.7
- Commercial financiers are estimated to provide USD 2.5 billion to Indonesia's BESS projects, half of total investment needs, while public finance provides an estimated USD 2.3 billion.p.9
- Weighted average cost of capital for BESS projects in Indonesia lies between 9% and 11%.p.10
- Steady capacity payments of an estimated USD 111 per kilowatt (kW) to USD 297/kW per year would deliver the returns commercial investors seek for standalone BESS.p.11
- The global average cost of turnkey 2-hour storage duration BESS declined by 46% from 2020 to 2025.p.14
- Utility-scale BESS installations exceeded 2 GW across the ASEAN region by the end of 2025, with installed capacity growing by 25% that year.p.17
Key insights
- Over 25% of future BESS capacity is allocated to independent power producers, mainly for hybrid installations.p.8
- Nearly 90% of the roughly 6 GW of standalone battery storage in the ARED scenario is planned for Sumatra and Java, Madura and Bali.p.8
- PLN is responsible for over 70% of total capacity additions but accounts for only 60% of overall BESS spending needs from 2026 to 2034.p.9
- Adding battery storage to solar PV projects raises PPA prices by a range of USD 8 per megawatt-hour (MWh) to USD 18/MWh across the RUPTL's main regions.p.11
- Total investment in utility-scale BESS in emerging market and developing economies excluding China nearly tripled from 2024 to 2025.p.13
- Battery storage remains in its early stages in Indonesia, with approximately 30 MW of capacity operational by the end of 2025.p.17
- The share of BESS capacity in EMDE excluding China rises from 5% in 2025 to 13% in 2035.p.18
- PLN plans over 42 GW of low-emissions power additions by 2035, including 13 GW of solar PV, 7 GW of wind and 5 GW of geothermal power.p.20
- Subsidy and compensation transfers to PLN reached IDR 200 trillion (USD 12 billion) in the 2025 fiscal year, around a third of total revenues.p.26