Electricity Supply Security Situation Report 2025 (BMWET (Österreich))
SaveSummary
- 2,578 MW of renewable generation capacity were added in Austria in 2024, including 2,130 MW of photovoltaics, 196 MW of wind, 120 MW of run-of-river and 15 MW of biomass and biogas.p.5
- Installed renewable generation capacity in the APG control zone was 25,545 MW at the end of 2024, including 8,360 MW of photovoltaics.p.6
- The EAG target requires 27 TWh additional renewable generation between 2021 and 2030, equal to 1,640 MW per year, versus 2,600 MW per year for the Transition scenario.p.6
- Domestic electricity generation in 2024 was 283.5 PJ against consumption of 259.1 PJ, and renewables made up 233.4 PJ or 90.1%.p.7
- Austria's gross electricity generation was 81,904 GWh in 2024.p.11
Key insights
- The average annual addition of 1,967 MW in 2021 to 2024 meets the EAG target but not the Transition scenario.p.6
- Austria was a net electricity exporter in 2024, as in 2023.p.7
- Run-of-river hydropower produced 33,262 GWh in 2024, storage hydropower 16,094 GWh and wind power 9,257 GWh.p.11
- Photovoltaics generated 7,645 GWh and natural gas 7,605 GWh in 2024.p.11
- The EAG targets 27 TWh of additional renewables, of which 11 TWh is photovoltaics and 10 TWh wind.p.12
- The EAG target requires installed renewable capacity of 33,870 MW by 2030.p.6
Topics and entities
Summary and figures generated from the document and checked automatically: every number shown appears on the cited page. The full document is available from the publisher. Publishers can request removal.