The Real Options Method in Innovation Project Evaluation: Gaps and Modification (Upravlenets)
SaveSummary
- The study combines a bibliometric analysis of 246 international Scopus publications for 2023–2026, a thematic analysis of 62 articles and a comparison with 61 Russian eLibrary publications.p.1
- The Russian search found 243 publications, narrowed to a final sample of 61 after screening.p.3
- Keyword co-occurrence maps identified six thematic clusters of international research and six of Russian research.p.1
- Four types of uncertainty and four categories of evaluation objects were systematized, with three directions of hybridization of the method.p.1
- Ignoring at least one of the uncertainty factors understates a project's option value by 25–40%.p.11
- Thematic analysis of the 62 most relevant articles produced six content clusters.p.4
Key insights
- Discounted cash flow methods cannot capture managerial flexibility, which becomes critical for innovation projects with long horizons and irreversible costs.p.2
- The cluster on digital assets and new evaluation objects was practically absent from publications before 2023.p.4
- International studies use a detailed typology of uncertainty (EPU, CPU, GPR, technological), while Russian works use a generalized category.p.6
- Classical real options theory relied on geometric Brownian motion, risk neutrality and homogeneous agents.p.6
- Evaluation objects now include R&D and patents, green and climate innovations, digital assets and AI, and ESG investments.p.7
- Behavioral factors and institutional context of developing markets are largely ignored by existing models.p.8
- The proposed modification combines a composite uncertainty index with game theory, multi-criteria analysis and machine learning.p.12
Funders mentioned
Topics and entities
Summary and figures generated from the document and checked automatically: every number shown appears on the cited page. The full document is available from the publisher. Publishers can request removal.